Connect with us

Bahamas News

ALERT #3 ON HURRICANE MARIA

Published

on

#Bahamas, September 19, 2017 – Nassau – ALERT #3 ON HURRICANE MARIA ISSUED BY THE BAHAMAS DEPARTMENT OF METEOROLOGY TUESDAY 19TH SEPTEMBER, 2017 AT 6PM EDT.

…POTENTIALLY CATASTROPHIC HURRICANE MARIA IS EXPECTED TO PASS NEAR THE U.S. VIRGIN ISLANDS TONIGHT AND OVER PUERTO RICO WEDNESDAY…

A  HURRICANE WATCH IS NOW IN EFFECT FOR THE SOUTHEAST BAHAMAS AND THE TURKS AND CAICOS ISLANDS.    THIS INCLUDES THE ISLANDS OF INAGUA, ACKLINS, CROOKED ISLAND, MAYAGUANA, LONG CAY, SAMANA CAY AND THE TURKS AND CAICOS ISLANDS.   

A HURRICANE WATCH MEANS THAT HURRICANE CONDITIONS ARE EXPECTED IN THE MENTIONED ISLANDS WITHIN 48 HOURS.

AT 5PM EDT, THE CENTER OF HURRICANE MARIA WAS LOCATED NEAR LATITUDE 16.8 DEGREES NORTH AND LONGITUDE 64.0 DEGREES WEST OR ABOUT 80 MILES SOUTHEAST OF SAINT CROIX, 175 MILES SOUTHEAST OF SAN JUAN PUERTO RICO, 268 MILES EAST-SOUTHEAST OF GRAND TURK THE TURKS AND CAICOS ISLANDS, 695 MILES EAST-SOUTHEAST OF MATTHEW TOWN INAGUA AND 1036 MILES EAST-SOUTHEAST OF NEW PROVIDENCE. 

MARIA IS MOVING TOWARD THE WEST-NORTHWEST AT 10 MPH, AND THIS GENERAL MOTION IS EXPECTED TO CONTINUE THROUGH WEDNESDAY NIGHT.   ON THE FORECAST TRACK, THE EYE OF MARIA WILL MOVE NEAR OR OVER THE U.S. VIRGIN ISLANDS TONIGHT, ACROSS PUERTO RICO ON WEDNESDAY, AND THEN PASS JUST NORTH OF THE COAST OF THE DOMINICAN REPUBLIC WEDNESDAY NIGHT AND THURSDAY.

MAXIMUM SUSTAINED WINDS HAVE INCREASED TO NEAR 165 MILES PER HOUR WITH HIGHER GUSTS.   MARIA IS A POTENTIALLY A CATASTROPHIC CATEGORY 5 HURRICANE ON THE SAFFIR-SIMPSON HURRICANE WIND SCALE.    SOME FLUCTUATIONS IN INTENSITY ARE LIKELY DURING THE NEXT DAY OR TWO, BUT MARIA IS FORECAST TO REMAIN AN EXTREMELY DANGEROUS CATEGORY 4 OR 5 HURRICANE UNTIL IT MOVES NEAR OR OVER THE VIRGIN ISLANDS AND PUERTO RICO.    SLOW WEAKENING IS EXPECTED AFTER THE HURRICANE EMERGES OVER THE ATLANTIC NORTH OF PUERTO RICO AND THE DOMINICAN REPUBLIC.

 HURRICANE FORCE WINDS EXTEND OUTWARD UP TO 35 MILES FROM THE CENTER AND TROPICAL STORM FORCE WINDS EXTEND OUTWARD UP TO 140 MILES FROM THE CENTER.

RESIDENTS IN INAGUA, ACKLINS, CROOKED ISLANDS, MAYAGUANA, LONG CAY, SAMANA CAY, AND THE TURKS AND CAICOS ISLANDS SHOULD RUSH TO COMPLETE  ALL HURRICANE PREPARATIONS AS THEY CAN BEGIN TO EXPERIENCE THE EFFECTS OF HURRICANE MARIA WITHIN THE NEXT 48 HOURS.   

 SMALL CRAFT OPERATORS IN THE SOUTHEAST BAHAMAS AND THE TURKS AND CAICOS SHOULD SEEK SAFE HARBOUR FOR THEIR VESSELS.

THE NEXT ALERT ON HURRICANE MARIA WILL BE ISSUED AT 9PM TODAY.

ISSUED BY: JEFFREY SIMMONS/MARY BUTLER

 

 

Continue Reading

Bahamas News

Statement on Road Traffic Department 

Published

on

#TheBahamas, September 26, 2022 – As an integral agency under the Ministry of Transport and Housing, the Road Traffic Department is responsible for the collection of revenue from vehicle licensing and inspection fees.

On an annual basis, the revenue from the Road Traffic Department exceeds 60 million dollars.

This revenue is critical in supporting the programmes and initiatives of the Government of The Bahamas and covers the operating costs of the Road Traffic Department.

The revenue must be protected.

To ensure the integrity of revenue collected, numerous processes and procedures have been implemented. Additionally, several audits have been undertaken to ensure that employees act in accordance with the established protocols of the Department.

The Ministry is aware of allegations and discord in the public domain between two employees at the Road Traffic Department.

While it is not the policy of the Government of The Bahamas to publicly comment on internal staff matters, the Ministry takes grave exception to personal allegations against employees being made public while the allegations remain under investigation by independent parties.

Public Officers are reminded of the provisions of General Orders which disallows public statements on any matter.

The Ministry continues to foster and encourage a harmonious and respectful working environment at the Road Traffic Department and all agencies under its remit.

The Ministry remains strongly committed to strengthening the audit and compliance oversight of the Road Traffic Department and will not be deterred its efforts to safeguard the Government’s revenue stream.

 

September 26th, 2022 

Ministry of Transport & Housing

Commonwealth of The Bahamas

Continue Reading

Bahamas News

NEMA Director orders activation of shelters in GB, Bimini

Published

on

NASSAU, The Bahamas – Director of the National Emergency Management Agency (NEMA), Captain Stephen Russell, Wednesday, ordered the activation of shelters in Grand Bahama and Bimini as a precautionary measure against potential impacts from Tropical Storm-Force conditions associated with Hurricane Ian.

 Six shelters were activated in Grand Bahama (two in Freeport, two in Eight-Mile Rock, and one each in Pinedale, Seagrape and Holmes’ Rock) and one in Bimini (Gateway in Bailey Town) at 10am. Captain Russell also announced that Floodwater Rescue Teams have been pre-positioned in West End and Alice Town as yet another precautionary measure.

 The National Emergency Management Agency’s National Emergency Operations Centre (NEOC) remained on Partial Activation Wednesday and will remain Activated throughout the response phase. Teams from the Royal Bahamas Defence Force, The Bahamas Department of Meteorology, the Department of Social Services, and the Department of Local Government, have been in communication with Island Administrators, Local Government officials and Disaster Consultative Committees in the north-western Bahamas.

 During Partial Activation, certain NEOC Team Members (known as Emergency Support Functions) are activated to monitor certain risks and/or hazards in areas that could be impacted by weather conditions associated with the passage of a storm, and as a means of communicating with/supporting disaster managers and planners and disaster consultative committees on the ground in those areas.

 The NEOC is responsible for executing emergency management and ensuring the continuity of operations for the entire country.

 Meanwhile, a Tropical Storm Warning remained in effect for the north-western Bahamas as at 12noon Wednesday with residents of Grand Bahama and the Biminis being advised to prepare for the possibility of sustained Tropical Storm-Force winds tonight through Thursday. Residents in the remainder of the northwest Bahamas, including Abaco, the Berry Islands, North Andros, New Providence and Eleuthera, could experience winds gusting to gale-force during this period.

 (A Tropical Storm Warning means that Tropical Storm conditions could be experienced in the mentioned islands within 36 hours.) 

 Forecasters at The Bahamas Department of Meteorology said rainbands associated with Hurricane Ian, will continue to affect the islands of the northwest Bahamas today and Thursday. Residents in these islands are asked to exercise extreme caution as the rainbands will bring severe thunderstorms, gusty winds and possible tornadic activity.

 Total rainfall amounts of 4 to 6 inches are expected with isolated amounts of up to 8 inches through Friday. As a result, severe, localized flooding is possible in low-lying and flood-prone areas.

Residents of low-lying, flood-prone areas of the north-western Bahamas, are asked to take special precautions during any heavy and/or prolonged rainfall event, and to exercise extreme caution in the event there is flooding. One such precautionary measure is to avoid driving in or through floodwater, where possible, or playing in floodwater (children) as floodwater can contain numerous hidden hazards. These include:

  • Downed power lines.
  • Sewage and other contaminants.
  • Large Holes.
  • Sharp objects that can cause injury and lead to infections.
  • Objects such as lumber, vehicles, debris.
  • Carcasses of dead animals, in addition to rodents and snakes.

Exposure to contaminated floodwater can result in:

  • Wound infections.
  • Skin rash.
  • Gastrointestinal illnesses.
  • Tetanus (Lock-jaw).

If you do come into contact with floodwater, you are advised to:

  • Wash the area with soap and clean water as soon as possible. If you do not have soap or water, use alcohol-based wipes or sanitizers.
  • Wash clothes contaminated with floodwater or sewage water in hot water and detergent before re-using them.

If you must enter floodwater, protect yourselves by wearing rubber boots, rubber gloves and goggles. The same goes for Standing Water.

The National Emergency Management Agency reminds residents to pay close attention to the Alerts, NEWS ITEMS, Public Forecasts, Severe Weather Warnings and/or Special Weather Statements issued by The Bahamas Department of Meteorology.

Continue Reading

Bahamas News

Glass Window Bridge envisioned as a symbol of resilience and sustainability says Works and Utilities Minister

Published

on

By KATHRYN CAMPBELL

Bahamas Information Services

 

#ELEUTHERA, The Bahamas, September 27, 2022 –  A new bridge design that incorporates opportunities for Bahamian entrepreneurs was presented at a Town Hall Meeting Thursday, September 22, 2022 at St. Patrick’s Lodge Hall, Hatchet Bay.

During the livestreamed event the Minister of Works and Utilities, the Hon. Alfred Sears; the Hon. Clay Sweeting, Minister of Agriculture, Marine Resources and Family Island Affairs; island administrators, representatives of the Ministry of Works, Town Planning Board, the Bridge Authority, Local Government, Lambert Knowles and other consultants, and residents of Eleuthera discussed plans for the proposed replacement of the Glass Window Bridge (GWB) in North Eleuthera.

Minister Sears termed the meeting very “successful” consultation and attendance by local stakeholders and virtual participants.

He said Mr. Knowles has assembled a world-class team of bridge designers who have put together a design that will turn the GWB “into a symbol of resilience, sustainability and also a place of entertainment and relaxation where Bahamian businesses can come and share in the wonderful goods of Eleuthera to the international travelling public as well as the residents in Eleuthera.

“We’re speaking now with Caribbean Development Bank with respect to funding; the design is now completed, there is also interest in PPP’s. Within the next two months we should have a funding pathway and then of course we will move on the procurement. Once the funding is in place we will announce a date.”

“It is not only a look out point, we are approaching this project as an enterprise where the people who live in Eleuthera would have the same opportunities that the people in South would have as the Disney Project would have, but it would be more significant than Disney because this project would be owned by Bahamian people — entrepreneurs, performers and culinary artists.

“Eleuthera is one of the places in the Commonwealth of the Bahamas where development is taking place very rapidly. It is one of the most unique communities in our country; it is the fifth largest economy within the Commonwealth of the Bahamas. We have some of the wealthiest industrialists with homes in Eleuthera; we also have booming Bahamian business resorts throughout Eleuthera.”

The GWD represents a place where we “can build opportunities for Bahamian businesses, Bahamian entrepreneurs to showcase the imagination of the Bahamian crafts persons, also to showcase the culinary skills as well as the extraordinary culinary dishes of Bahamian cuisine,” he said.

Although “spectacular” Minister Sears said the current one-lane bridge is “dangerous” and unable to facilitate the transport of freight from the north to the south of the island because its carrying capacity is only 12 tonnes — anything over 12 tonnes cannot be transported over the bridge.

He noted other challenges and informed that the bridge is not fulfilling the potential that it has for the development of Eleuthera.

Using a Power Point presentation, Mr. Knowles introduced the design team, technical aspects of the built design and various options considered for the new bridge.

He said the proposed bridge will be unique; a picture opportunity and a venue to host an event. It will have a park, security, rest rooms, parking, a location for food trucks to sell crafts and food; and topography with different elevation.

During the question and answer segment, Minister Sears said a decision has not yet been made regarding a bridge toll on the major undertaking.

“It is a project which multilateral bodies and private sector investors have expressed an interest in participating in the funding. It is a project that once we have the community by-in the government is committed to building a world class production at this location.” Construction is expected to take place on the proposed bridge from 2023-2026 at an estimated cost of $50-$60 million.

The GWB was built in 1990 and provides the only vehicular link between North and South Eleuthera.

 

(BIS Photos/Ulric Woodside)

Continue Reading

FIND US ON FACEBOOK

TRENDING